slab caster meaning in English
板努铸机
板坯连铸机
Examples
- Reasons and preventing measures of breakout in slab caster
连铸板坯漏钢的影响因素及防止措施 - Study and discussion of the electro - magnetic stirrer on the continuous slab caster
板坯连铸电磁搅拌器的研究与探讨 - For changing the phase , decide eliminate mould casting and establish continuous casting ( no . 2 slab caster , one strand ) . the writer is the principal of this project
为从根本上改变此局面,决定淘汰模铸、增建连铸( 2号板坯连铸机、单流) 。 - Pangang iron and steel co . exits one set of double slab caster , but continuous casting rate is 50 . 6 % and under metallurgy industry average , and its mould casting devices are established at the beginning of 1970s , the devices are old , consumed energy is high , severity pollution , low metal callback , quality is not stable , these restrict competition for market
攀钢炼钢厂现有一台双流连铸机,但其全年连铸比才50 . 6 % ,低于我国冶金行业平均水平,并且其现存的模铸锭设施系七十年代初建成,设备陈旧、能耗高、污染严重、金属收得率低、产品质量不稳定,制约了攀钢产品在市场上的竞争力。 - Success in addition of no . 2 slab caster of the pangang iron and steel co . have brought large economic and social benefits ! the succeed example design of automation are provided for the decision and popularization and implementation of add for old equipment . this project was conjoin of design and program and debug . the control effect of no . 2 slab caster is satisfying , moreover , achieve high speed and whole automatic aim
攀钢炼钢厂新增2 #板坯连铸机的成功,将具有很好的经济和社会效益,尤其是该项目的自动化设计方案为自动化控制系统在企业旧设备改造及再增加新设备时的决策、推广、实施提供了一套较为有效的、可供借鉴的方法和模式。